MIM Pneumatic Nozzle Key Sleeve Parts
Metal Injection Molding Asia China MIM Suppliers Custom Shapes Power Tool Spare Parts
- Type: Metal Structure Parts
- Material:Iron Powder, Iron Powder, Composite Material
- Item Name:Sintered iron parts
- Surface Treatment:CNC Machining, Oil Immersion
- Minimum order quantity: 5000PCS
- Payment method: TT/LC
- Supply capacity: 200000pcs/month
- Delivery period: 15-30days
- Regular packaging: custom made, PE bag / carton / fumigation-free tray customized / PE bag + carton + wooden pall
What is Pneumatic Nozzle Key Sleeve Parts
Pneumatic nozzle key sleeve parts, such as a key or sleeve, are typically associated with air nozzles and are used to secure them in place or adjust their angle. These parts may be used to facilitate installation, adjustment, or removal of the nozzle, and are commonly found in applications involving vibratory feeder bowls, cooling, moving, and lubricating systems.
In essence, these parts work together to form a pneumatic pinch valve, which uses a flexible sleeve to control the flow of fluids by pinching or releasing the flow path. This type of valve is efficient, easy to clean, and reduces the risk of contamination since the sleeve is the only part that comes into direct contact with the fluid.
Production cost comparision between MIM and other processes
Cost Effective Design Flexibility/ Material Variety and Integrity
Powder metallurgy can ensure the accuracy and uniformity of the material composition ratio. Suitable for producing products of the same shape and large quantities, low production cost.
Auto Parts Manufacture Compare with other process
Parameter | MIM | CONVENTIONAL PM | MACHINING | INVESTMENT CASTING |
Density | 98% | 88% | 100% | 98% |
Tensile Strength | High | Low | High | High |
Elongation | High | Low | High | High |
Hardness | High | Low | High | High |
Min. Wall Thickness | 0.5 mm | 1 mm | 0.5 mm | 2 mm |
Complexity | High | Low | High | Medium |
Surface Finish | High | Medium | High | Medium |
Production Volumes | High | High | Low | Medium |
Range of Materials | High | High | High | Medium-High |
Cost | Medium | Low | High | Medium |
Service:
1, 100% inspection before shipment.
2, Satisfied packing, carton, wooden case, pallet,or according to your requirement.
3, Samples are within 35-40 days after the receipt of the deposit. production will be finished about 25-30days after samples confirma
Production Capacity comparision of MIM and other process
Most difficult metals and compounds, pseudo alloys, porous materials can only be manufactured by powder metallurgy
Auto Parts MIM Material
Material | Composition |
Low alloy steel | Fe-2Ni, Fe-8Ni |
Stainless steel | 316L, 17-4-PH |
Tool steel | 42CrMo4, M2, Skd-11, C45 |
Carbide | WC-Co(6%) |
Ceramics | Al203, ZrO2, SiO2 |
Tungsten alloy | W-Ni-Fe, W-Ni-Cu, W-Cu |
Related Products
Related products
-
Industrial and Tools Parts
Metal Injection Molding Planetary Gear Parts
-
Industrial and Tools Parts
MIM Sewing Machine Presser Foot Parts
-
Industrial and Tools Parts
MIM Car Door Lock Cylinder Parts
-
Industrial and Tools Parts
MIM Power Gear Spare Parts